Fibre Bond Technique: Direct Bridge Construction |
||
|
Pre-op |
2 Closer view |
3
Rubber dam isolation
|
|
4 Etch – no preparation done. A singulum rest preparation can be considered
|
5
Fibres, palatal view
|
6
Fibres, labial view
|
|
7. Stretch rubber dam ensuring close contact onto gingiva
|
8
Partially constructed pontic, palatal view
|
9Partially
constructed pontic, labial view
|
|
10Air
bubble
|
11Applying
Stick™ Resin in order to obtain interpenetrating bonding network in
the cured composite
|
12Protect
the resin from light
|
|
1 3 Air bubble restored
|
14
Adjust occlusion
|
15
Finish and polish
|
|
16 Oral
hygiene instructions
|
17
Post-op
|
|